HPSI PILE DRIVER DOWNLOAD

The company laid miles of inch steel welded pipe, starting at the Indiana-Michigan border, running across the top of Indiana and ending near Joliet, IL, said Leon Loftis, equipment supervisor for Sheehan. After we finished in one area our cleanup crews would pull out the mats and we’d reuse them, but we needed 7, of them just to keep going,” Loftis commented. We used 7, mats. We were attracted by the technology on the Mobilram and its ability to pull and drive more sheet piling. Our service and support staff, located in eight regional offices throughout the U.

Uploader: Kazrazahn
Date Added: 17 December 2011
File Size: 31.36 Mb
Operating Systems: Windows NT/2000/XP/2003/2003/7/8/10 MacOS 10/X
Downloads: 48185
Price: Free* [*Free Regsitration Required]

The Mobilram utilized by Sheehan was equipped with a high frequency vibratory driver and on-board computer which insured accurate pile placement.

After we finished in one area our cleanup crews would pull out the mats and we’d reuse them, but we needed 7, of them just to keep going,” Loftis commented. This German-made system really speeded up the project, Loftis noted.

Sheehan Pipeline Meets Piile, Environmental Challenges Neither rain nor mud nor wetlands could keep Sheehan Pipeline Construction Company from completing its natural gas pipeline project across northern Indiana. In all, more than 2, wall-feet of steel piling was purchased or rented for the project. We sell, rent, and service high quality equipment from all around the world, including pile drivers, drilling rigs, impact hammers, pile products, and much more.

  IBM XIRLINK USB CAMERA DRIVER DOWNLOAD

Hammer & Steel | ABI and HPSI Equipment Used by Sheehan Pipeline in Northern Indiana Project

It was our first experience with this machine, and we found it worked very well on our project. And when we ordered piling, we would get a call within an hour telling us the first truck was loaded and pulling out and npsi were starting on another truckload. The company laid miles of inch steel welded pipe, starting at the Indiana-Michigan border, running across the top of Indiana and ending near Joliet, IL, said Leon Loftis, equipment supervisor for Sheehan.

There was speedy response any time we needed equipment. The PZ piling was driven, extracted, and re-driven several times as work progressed across the state. We used 7, mats. We were attracted by the technology on the Mobilram and its ability to pull and drive more sheet piling. Work on the project for Vector, a Canadian natural gas company, started in late May and was completed by the end of October At its peak, more than workers were on the job.

  EVERE BLUETOOTH HEADSET DRIVER DOWNLOAD

Neither rain nor mud nor wetlands could keep Sheehan Pipeline Construction Company from completing its natural gas pipeline project across northern Indiana.

J&G Sales – Pile Driving Equipment, Pile Driver, Excavator, Piles

Our service and support staff, located in eight regional offices throughout the U. The project was marked by pule and rainy conditions throughout, according to Loftis.

Along with rainy weather, the company had to deal with many Environmental Protection Agency-designated wetland areas. It rained 26 hpwi the first month Sheehan was on the job, and it continued to rain all summer long.